Target hall 6 thermocouples, Budal monitor,.Magnetic shielding check on HV101 string.Monitors, 4 total loss monitors, 2 toroids, 3 Primary beam 49 magnets, 24 BPMs, 10 Profile.Notes field defines the required checkout actionįor each sub-system (e.g.

numi device

  • The Commissioning Plan identifies a finalĬheckout step (200) that requires documented.
  • Manager in the NuMI Beamline electronic logbook In the documentation of readiness by the 元
  • Checkout is a multi-step process that culminates.
  • The purpose of the Commissioning Plan is toĮnsure that every sub-system is fully checked out.
  • Master schedule at a summary level to capture
  • Sub-system checkout tasks are included in the.
  • Booster notch needs to be syncd to the kicker.
  • Demonstrate high intensity multi-batch capability.
  • Start multi-batch mode studies after board is.
  • Instrumentation, RF cavities and kicker exist.
  • The bunch-by-bunch digital damper system (Run II).
  • Planned for normal operation Not necessary to
  • MI beam quality inputs to the NuMI Beam Permit.
  • Synchronizing Booster/MI injection (Booster.
  • Commissioning will be done on a special NuMI-only.
  • Antiproton beam requirements are tighter than.
  • NuMI will receive 5 batches for a total intensity.
  • The Antiproton Source requires 1 batch ofĠ.8x1013 protons to be achieved by slip-stacking.
  • A 1.877 sec MI cycle will accommodate 6 batches.
  • Mixed-mode with antiproton stacking at 120 GeV
  • After commissioning, NuMI will operate in a.
  • Description of pre-commissioning activities.
  • The primary purpose of the plan is to ensure thatĪll required tasks are identified and completed.
  • Checkout steps, e.g Put profile monitors into the.
  • NuMI systems checkout tasks costed in the Master.
  • Main Injector studies that are difficult toĮstimate (e.g.
  • Canonical off-project tasks that can be readilyĮstimated, e.g.
  • numi device

    The commissioning plan includes several flavors.Main Injector High Intensity (2 tasks need.Each task is assigned to a responsible person,Īpprox start approx duration, notes, device.NuMI checkout commissioning activities are.Goal 4,6 MINOS displays of cosmic ray events in.Goal 3,5 Detector measurements of pulse heightĪnd event length consistent with neutrino.Position in pre-target display showing beam Goal 2 ACNET parameter page showing beam.Goal 1 ACNET parameter page showing proton.Greg Bock memos to Steve Webster with supporting We plan to follow the Main Injector model forĭocumentation acceptance of goal achievement.Technical Commissioning Goals required to meet The NuMI Project Management Plan describes the.Attended by 35 participants from NuMI, MINOS,.Commissioning workshop held in April to define.MINOS Near Detector Commissioning Coordinator.NuMI Commissioning Coordinator Bruce Baller.Maximize efficiency and minimize impact to Coordinators will schedule these activities to.The NuMI project has retained the responsibilityįor conducting and documenting all checkout and.The MINOS detectors can be commissioned almost.Checkout commissioning sub-systems prior to.Commissioning bringing the facility into.This definition is slightly modified for the.Off-project activities such as Main Injector.Commissioning bringing the NuMI facility into a.